Fan Deck Refurbishment

Project: Fan Coil Unit Overhaul
Duration: 3 weeks
Value: £40,000

Office

As part of the lifecyle upgrades, Cbb were asked to refurbish 140 fan decks which were over 15 years old.

The works were split over three weekends; a site team was assembled to remove a designated number of fan decks via a desk surfer and return to our workshop for a full repair. The units were cleaned, new motors were installed, the impellers were balanced and the unit was then rebuilt and tested. The decks were re-installed by the site team, tested, and then left operational. This process continued until all the units were repaired.

Benefits

  • Improved airflow
  • Reduced noise
  • Greater service life
  • Reduced maintenance