Project: Booster Set Replacement including BACNET Control Panel
Duration: 2 Weekends – no down time
Value: £36,000

The existing twin pump softened water booster set (configured in a duty/assist arrangement) at B1 level served the softened water supply to the Landlord Chilled Water System Cooling Towers at roof plant level. The packaged unit did not satisfy the make-up demand at peak times and did not have connectivity to the BMS system.

Cbb installed a complete new Armstrong Booster Set including BACNET control panel, stripping out the redundant set.  The existing pipework was modified to facilitate the installation of the new booster set.  A prefabricated galvanised steel framework was also installed to support the new equipment.

Our Project Managers liaised with the appointed controls contractor to introduce the new equipment onto the BMS System and the unit was commissioned.